翻訳と辞書
Words near each other
・ HWA (group)
・ Hwa Chong Institution
・ Hwa Chong Institution Boarding School
・ Hwa Chong Institution Chinese Orchestra
・ Hwa Chong Institution High School Band
・ Hwa Chong International School
・ Hwa Chong Junior College
・ HWA Cruiserweight Championship
・ HWA Heavyweight Championship
・ HVDC Haenam–Cheju
・ HVDC Hellsjön–Grängesberg
・ HVDC HelWin1
・ HVDC HelWin2
・ HVDC Hokkaido–Honshu
・ HVDC Inter-Island
HVDC Itaipu
・ HVDC Italy–Corsica–Sardinia
・ HVDC Italy–Greece
・ HVDC Kingsnorth
・ HVDC Lehrte–Misburg
・ HVDC Leyte–Luzon
・ HVDC Mechanicville–Schenectady
・ HVDC Moyle
・ HVDC Norway–Germany
・ HVDC Rihand–Delhi
・ HVDC Russia–Finland
・ HVDC Sileru–Barsoor
・ HVDC SylWin1
・ HVDC Thailand–Malaysia
・ HVDC Three Gorges – Changzhou


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

HVDC Itaipu : ウィキペディア英語版
HVDC Itaipu

The HVDC Itaipu is a High Voltage Direct Current overhead line transmission system in Brazil from the Itaipu hydroelectric power plant to the region of São Paulo. The project consists of two ±600 kV bipoles, each with a rated power of 3150 MW, which transmit power generated at 50 Hz from the Paraguay side of the Itaipu Dam (near Foz do Iguaçu in Paraná) to the Ibiúna converter station near São Roque, São Paulo. The system was put in service in several steps between 1984 and 1987, and remains among the most important HVDC installations in the world.
When the first bipole was completed in 1985, it became the world's largest HVDC system by both power transmission capacity and voltage, titles which it would hold for 25 years until the completion, in 2010, of the ±800 kV, 6400 MW HVDC link from Xiangjiaba Dam to Shanghai in China. It also contained important innovations in real-time control systems, being one of the first HVDC schemes to use digital control equipment using microprocessors. Nevertheless it suffered reliability problems in its first few years of operation, with numerous converter transformer failures and one serious converter fire, although reliability is now reported to be much improved. 〔Praça, A., Arakari, H., Alves, S.R., Eriksson, K., Graham, J., Biledt, G., (Itaipu HVDC Transmission System - 10 years operational experience ), V SEPOPE, Recife, May 1996.〕
==Technical description==
High Voltage Direct Current (HVDC) was chosen both because this technique allows long transmission lines with little loss compared to other systems (like AC), and also allows interchange of the Paraguayan 50 Hz input and the Brazilian 60 Hz input and user grid.
Both lines operate at ±600 kV and are built as overhead lines with a length of 818 (North line) and 807 (South line) kilometers. Away from their terminal stations, the two lines are at least 10 km apart to reduce risks. Each one is designed for 3150 MW at ± 600 kV D.C. and 2625 A. The lines are 4 x 689 mm² (about 30 mm ∅) ACSR cables.
The incoming supply is 500 kV AC from the 50 Hz generators at the hydro dam (Foz do Iguaçu). The outgoing power is 345 and 500 kV, 60 Hz AC into the South/Southeastern grid (Ibiúna, São Paulo).
The converter equipment, supplied by ABB Group, uses thyristor valves arranged in two, twelve-pulse bridges per pole.
In parallel with the HVDC system, two 765 kV AC lines carry power from the 60 Hz generators on the Brazilian side of the dam to the São Paulo region. At into the route, at Ivaiporã (Parana), there is a branch into 500 kV, 60 Hz AC, delivering into the Southern grid. By introducing, in 1989 and later, series capacitors in Ivaiporã (at of the line) and Itaberá (at ) the capacity grew from 4300 MW to 6300 MW.〔 〕

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「HVDC Itaipu」の詳細全文を読む